The first phase of the Hong En Temple House Project

First phase of the Hong En Temple Project (2011-2012, RMB 950 million)
Region: Chongqing Progress Stage: Project Approval Verification Construction Period: 2011-2012

Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, cranes, excavators, fans, speed-up devices, generators, control devices, adjustment systems, and support towers.

Project Description:
The project is located in K Block No. K03-2/02 of K-zone of Dashiba Group, Jiangbei District, Chongqing Municipality, and the second phase of the Hongnsi Temple Project was first created. The scale and content of the project are as follows: the total land area of ​​Phase II is 83,881 square meters, and the total construction area is 314774.4 square meters, among which the above-ground houses The building area is 26,860,44 square meters. The construction content includes residential buildings, underground garages, and current backbone facilities. The total investment of the project is 95186.12 ten thousand yuan.

Construction Unit: Chongqing Chuangxin Stone Real Estate Co., Ltd. Postal address: Jiangbei District, Chongqing Zip Code: 401100
Contact: Chen Yi Tel

Related Developments: Tower Crane Infrastructure Project

Kitchen Items

Kitchen Items,Storage Baskets,Chopping Board,Ceramic Fry Pan

Xinhui Mingcheng Hardware Mamufacture Limited of Jiangmen City , https://www.gd-jmmc.com

Posted on