Introduction                                        Â
The Core Drilling Rig Machine is suitable for drilling works such as water well drilling, general exploration, geophysical exploration, road and building exploration, blasting hole drilling and so on.
Parameters                                         Â
Model | YG-130Y/130YY | YG-180Y/180YY | YG-200Y/200YY | |||
Drilling Depth (m) | 130 | 180 | 200 | |||
Open Drilling Diameter (mm) | 220 | 220 | 325 | |||
Final Hole Diameter (mm) | 75 | 75 | 75 | |||
Drill Pipe Diameter (mm) | 42-60 | 42-60 | 42-60 | |||
Drill Pipe Inclination (°) | 90-75 | 90-75 | 90-75 | |||
Power (kw) | 13.2 | 13.2 | 14.7 | |||
Weight (kg) | 920 | 950 | 1150 | |||
Dimensions (mm) | 2400*950*1400 | 2400*950*1400 | 2700*950*1770 | |||
Vertical Axis | ||||||
Vertical Axis Speed (r/min) | 142 285 570 | 130 300 480 730 830 1045 | 64 128 287 557 | |||
Vertical Axis Travle (mm) | 450 | 450 | 450 | |||
Hoist | ||||||
Single Rope Lift Force | 2000 | 2100 | 2500 | |||
Single Rope Lift Speed (m/s) | 0.41-1.64 | 0.35-2.23 | 0.12-0.95 | |||
Reel Diameter (mm) | 140 | 140 | 140 | |||
Wire Rope Diameter (mm) | 9.3 | 9.3 | 12.5 | |||
Wire Rope Capacity (m) | 27 | 27 | 35 | |||
Cobalt Tower | ||||||
Rated Load | 18 | 18 | 18 | |||
Effective Height | 6.5 | 6.5 | 6.5 | |||
Tower Specifications (mm) | 73 | 73 | 89 | |||
Mud Pump | ||||||
Model | BW95 | BW95 | BW145 | |||
Flow (L/min) | 95 | 95 | 145 | |||
Max Pressure (Mpa) | 1.2 | 1.2 | 2 | |||
Reciprocations No. (times/min) | 93Â | 93 | 93 | |||
Suction Pipe Diameter | Φ51mm*4.5m | 51mm | 51mm | |||
High Pressure Pipe Diameter | Φ32mm*6m | 32mm | 32mm |
Â
Product Display                                           Â
Â
1, With automatic oil supply mechanism, improving drilling efficiency, reducing labor intensity.
2, The use of ball clamping mechanism instead of chuck, can achieve non-stop inverted bar, be easy to operate, safe and reliable.
3, With a hole-bottom pressure gauge, easy to control the situation in hole.
4, Compact structure,centralized handle, small footprint, light weight, strong decomposition, easy to move. Suitable for plain and mountain areas.
Working                                           Â
FAQ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
Q1: Are you trading company or manufacturer?
A1: We are original equipment manufacturer.
Q2: How long is your delivery time?
A2: It is according to the model and quantity.
    Generally it is 3-5 days if the machines are in stock.Â
    It will be 15-30 days if you want to customize the machines.
Q3: Do you provide samples? Is it free or extra?
A3: Yes, we could offer you the sample machine.
  But it's not free. You need to pay for the sample and the cost of freight.
Q4: What is your terms of payment?
A4: We accept T/T, Western Union, Money Gram, Paypal, Alibaba Escrow etc.
     Payment<=USD 5000, 100% in advance.Â
     Payment>=USD 5000, 30% T/T in advance, balance before shipment.
Henan Yugong Machinery Co.,Ltd. is specialized in machinery in China over 20 years.We are committed to researching and developing all kinds of mineral equipment, construction machinery,  prestressed machinery, metallurgy machinery etc.
Our company has more than 500 employees,including more than 30 senior technical staff and 30 international sales persons.We can supply high quality and professional services.
Henan Yugong Machinery Co., Ltd aims to have top quality, top reputation and top service. "Quality First, Reputation First, Be Innovative, Be Excellent" has always been our purpose. We warmly welcome your corporation from all fields and build great future for us all.Â
 Water Well Drill Rig Machine
Introduction                                        Â
The Core Drilling Rig Machine is suitable for drilling works such as water well drilling, general exploration, geophysical exploration, road and building exploration, blasting hole drilling and so on.
Parameters                                         Â
Model | YG-130Y/130YY | YG-180Y/180YY | YG-200Y/200YY | |||
Drilling Depth (m) | 130 | 180 | 200 | |||
Open Drilling Diameter (mm) | 220 | 220 | 325 | |||
Final Hole Diameter (mm) | 75 | 75 | 75 | |||
Drill Pipe Diameter (mm) | 42-60 | 42-60 | 42-60 | |||
Drill Pipe Inclination (°) | 90-75 | 90-75 | 90-75 | |||
Power (kw) | 13.2 | 13.2 | 14.7 | |||
Weight (kg) | 920 | 950 | 1150 | |||
Dimensions (mm) | 2400*950*1400 | 2400*950*1400 | 2700*950*1770 | |||
Vertical Axis | ||||||
Vertical Axis Speed (r/min) | 142 285 570 | 130 300 480 730 830 1045 | 64 128 287 557 | |||
Vertical Axis Travle (mm) | 450 | 450 | 450 | |||
Hoist | ||||||
Single Rope Lift Force | 2000 | 2100 | 2500 | |||
Single Rope Lift Speed (m/s) | 0.41-1.64 | 0.35-2.23 | 0.12-0.95 | |||
Reel Diameter (mm) | 140 | 140 | 140 | |||
Wire Rope Diameter (mm) | 9.3 | 9.3 | 12.5 | |||
Wire Rope Capacity (m) | 27 | 27 | 35 | |||
Cobalt Tower | ||||||
Rated Load | 18 | 18 | 18 | |||
Effective Height | 6.5 | 6.5 | 6.5 | |||
Tower Specifications (mm) | 73 | 73 | 89 | |||
Mud Pump | ||||||
Model | BW95 | BW95 | BW145 | |||
Flow (L/min) | 95 | 95 | 145 | |||
Max Pressure (Mpa) | 1.2 | 1.2 | 2 | |||
Reciprocations No. (times/min) | 93Â | 93 | 93 | |||
Suction Pipe Diameter | Φ51mm*4.5m | 51mm | 51mm | |||
High Pressure Pipe Diameter | Φ32mm*6m | 32mm | 32mm |
Â
Product Display                                           Â
Â
1, With automatic oil supply mechanism, improving drilling efficiency, reducing labor intensity.
2, The use of ball clamping mechanism instead of chuck, can achieve non-stop inverted bar, be easy to operate, safe and reliable.
3, With a hole-bottom pressure gauge, easy to control the situation in hole.
4, Compact structure,centralized handle, small footprint, light weight, strong decomposition, easy to move. Suitable for plain and mountain areas.
Working                                           Â
FAQ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
Q1: Are you trading company or manufacturer?
A1: We are original equipment manufacturer.
Q2: How long is your delivery time?
A2: It is according to the model and quantity.
    Generally it is 3-5 days if the machines are in stock.Â
    It will be 15-30 days if you want to customize the machines.
Q3: Do you provide samples? Is it free or extra?
A3: Yes, we could offer you the sample machine.
  But it's not free. You need to pay for the sample and the cost of freight.
Q4: What is your terms of payment?
A4: We accept T/T, Western Union, Money Gram, Paypal, Alibaba Escrow etc.
     Payment<=USD 5000, 100% in advance.Â
     Payment>=USD 5000, 30% T/T in advance, balance before shipment.
Henan Yugong Machinery Co.,Ltd. is specialized in machinery in China over 20 years.We are committed to researching and developing all kinds of mineral equipment, construction machinery,  prestressed machinery, metallurgy machinery etc.
Our company has more than 500 employees,including more than 30 senior technical staff and 30 international sales persons.We can supply high quality and professional services.
Henan Yugong Machinery Co., Ltd aims to have top quality, top reputation and top service. "Quality First, Reputation First, Be Innovative, Be Excellent" has always been our purpose. We warmly welcome your corporation from all fields and build great future for us all.Â
Â
Why say closed cooling tower is energy saving and environmental protection equipment, more and more users are using this kind of equipment to replace the original equipment (open tower), we can through data analysis and comparison, the two energy data accounting can be obvious. Energy consumption is basically two major aspects, one is water, the other is electricity. Both are energy costs that no cooling tower can escape, unless you leave the equipment on.
First of all, look at the consumption of water. Water is generally consumed in two aspects. One is the flying overflow after spraying, and the other is the evaporation consumption of water.
Let's look at the open cooling tower, the spray water of the tower is basically between two and three percent of the overflow rate, if we according to the daily operation of 10 hours, excluding holidays, 280 days of operation. According to the actual open cooling tower flow of 6000 cubic meters per hour to calculate. 6000*2%*10*280= 336,000 tons of water, and the same closed cooling tower, its spray flying overflow is very small, because after all, the spray work is carried out in the tower, almost can be controlled in a few thousandths, we calculate according to 5 thousandths, the same is 10 hours of work, 280 days a year operation, To achieve the same cooling amplitude is basically 4,500 tons per hour of closed cooling tower is enough, then the calculation results: 4,500 *0.5%*10*280= 63,000 tons, it is not difficult to see, because of the different design structure caused by the waste of spraying water resources, more than 200,000 tons of terror. The bigger the pool of the open tower, the more wasted water, because the evaporation area increases, and the closed cooling tower has no pool, so the consumption here is zero. Judging from the price of a ton of water, just such a equipment, a year to solve the capital of hundreds of thousands of enterprises.
Let's look at the comparison of electric energy, electric energy is not different, because they are all through the same power equipment to operate the equipment, the power of the two is similar, the running time is the same, basically the energy consumption is about the same.
To sum up, for the closed cooling tower energy saving accounting can be strong to open the tower out, and, today are advocating energy conservation and environmental protection, this is the general trend, so the closed cooling tower is more and more favored by the majority of users.
Closed Cooling Tower,Closed Circuit Cross Flow,Closed Loop Cooling Tower,Closed Circuit Cooler
Wuxi Ark Fluid Science Technology Co., Ltd. , https://www.fangzhou-arkfluid.com