
According to reports, Jiangnan Expressway project design period is 42 months, according to the current progress, is expected to be opened to traffic one year ahead of schedule.
We have a line of manufacture and sales departments, mainly focus on malleable iron pipefitting and ductile iro grooved fittings.
Grooved fittings ductile iron pipe fittings double socket bend 90 elbows grooved fittings application: Suitable for fire piping system, air, steam, water,gas, oil , home decoration , equipment and so on.
Dismantling Joint,Ductile Iron Dismantling Joint,Dismantling Joint For Pipe Connection,Flanged Dismantling Joint
SUZHOU YUEDA VALVE CO., LTD. , https://www.jsyuedavalve.com